If you’re planning to upgrade your home with an energy-efficient air conditioner or heat pump under the Victorian Energy Upgrades (VEU) program, you’re likely asking:
“How long does the entire process take?”
At Greentastic Pty Ltd, we make it smooth and transparent for Melbourne and Victorian homeowners. Here’s a step-by-step breakdown of what to expect—from approval to final installation.
🔍 Step 1: Initial Enquiry & Eligibility Check (1–2 Days)
Once you contact Greentastic via phone or website, our team performs a quick eligibility assessment based on:
- Your address and energy provider
- Existing heating/cooling systems
- Occupancy status (owner/tenant)
🕐 Timeframe: Usually within 24–48 hours.
📑 Step 2: Document Collection & VEU Form Signing (1–2 Days)
If you’re eligible, we’ll request:
- Proof of residence/ownership or tenancy
- A signed VEEC Assignment Form (required for all VEU installations)
Our team assists with digital documentation for faster turnaround.
🕐 Timeframe: 1–2 business days (faster with prompt cooperation).
🏢 Step 3: Scheduling the Installation (1–5 Days)
After receiving signed forms, we book your installation date based on:
- Availability of stock (Split, Ducted, Reverse Cycle, or Hot Water Heat Pump systems)
- Technician availability in your area
- Access to your property
🕐 Timeframe: Usually within 3–5 working days.
🛠️ Step 4: Installation Day (Half Day to Full Day)
The actual air conditioning or heat pump installation is carried out by VEU-accredited electricians and plumbers. The system is tested, and your old unit (if any) is responsibly removed for recycling or disposal.
🕐 Timeframe:
- Split system: 2–4 hours
- Reverse cycle ducted system: 4–8 hours
- Hot water heat pump: 2–3 hours
✅ Step 5: Post-Installation Compliance & VEEC Submission (1–3 Days)
Once installation is complete, Greentastic:
- Conducts a quality check
- Collects any final photos or documents
- Submits your job to the VEU registry for certificate creation (VEECs)
🕐 Timeframe: 1–3 days (admin and processing)
🧾 Total Time from Approval to Finish: 5 to 10 Business Days
Depending on:
- How quickly documentation is completed
- Location & schedule
- Type of system installed
💡 Greentastic Tip:
We recommend preparing documents in advance and being flexible with installation slots. This can cut the overall waiting time by 2–3 days!
Why Choose Greentastic Pty Ltd for VEU Upgrades?
✅ VEU-Experienced Partners
✅ Fast Turnaround & Expert Installers
✅ Support Throughout the Process
✅ Local Expertise in Melbourne & Surrounding Suburbs